We ripped up 650 sq ft of flooring in Toronto that involved a mix of glue-down hardwood and tile. The worksite had a tight layout, and part of the tile was under the kitchen. That made things really interesting for our team. We had to be precise and patient to protect the cabinetry while still safely removing old flooring

Removing old flooring without touching the kitchen was the main challenge, but we got it done in one day! We were happy to do this for our customer, and we’re ready for our next challenge. Looking for a top-rated demolition company? Reach out to us today!

Project Highlights

  • Location: Toronto
  • Date: April 1, 2025
  • Size: 650 sqft
  • Type: Remove tile and hardwood
  • Timeframe: 1 day
  • Key Detail: Kitchen remained in place

See Before and After




We ripped up 650 sq ft of flooring in Toronto that involved a mix of glue-down hardwood and tile. The worksite had a tight layout, and part of the tile was under the kitchen. That made things really interesting for our team. We had to be precise and patient to protect the cabinetry while still […]